Reboot schedules are not EAP215-Bridge friendly.
This is my configuration:
ER7212PC---PoEinjector---EAP650-Outdoor
---PoEinjector---EAP215-BridgeAP >>>WiFi<<< EAP215-BridgeClient---PoEinjector---PoEinjector---EAP610-Outdoor
*Traffic traveling from EAP650-Outdoor to EAP610-Outdoor through the bridge.
After a scheduled reboot:
ER7212PC---PoEinjector---EAP610-Outdoor >>>Mesh<<< EAP610-Outdoor
---PoEinjector---EAP215-BridgeAP >>>WiFi<<< EAP215-BridgeClient---PoEinjector---PoEinjector---EAP610-Outdoor
*Traffic traveling from EAP650-Outdoor to EAP610-Outdoor via mesh.
The only sequence that fixes this is to forget both ends of the bridge (EAP215-BridgeAP and EAP215-BridgeClient), and the EAP610-Outdoor. Reprovision the bridge EAP215-BridgeAP first, reprovision the EAP215-BridgeClient second, and then reprovision the EAP610-Outdoor. The bridge kit does not like scheduled reboots. I hope TPL can do something about this.